Win-Win Cooperation · Customer Success Cases2


Release Time:

2026-03-03

A US-based global water management provider in need of a one-stop turnkey solution covering the entire process from product design to manufacturing.

Case 2: Turnkey Solution from Design to Manufacturing – Driving Cost Reduction and Efficiency for US Global Water Management Provider

Customer Profile

 A US-based global water management provider in need of a one-stop turnkey solution covering the entire process from product design to manufacturing.

Customer Challenges

The need to redesign and consolidate multiple products by cutting 36 PCBs down to 13 and 54 product SKUs to 32, while ensuring all redesigned products fully comply with the UL61010 safety standard.

Creation Solutions Provided

  • Customized a low unit cost solution on the premise of guaranteed product performance
  • Delivered comprehensive solutions integrating Electrical, Firmware, Mechanical, and Manufacturing Test capabilities
  • Implemented Rapid Prototyping to accelerate product design verification and iteration
  • Applied advanced technologies including OLED Displays, Wide Voltage and Temperature Range, Microprocessor, and Differential Pressure for product R&D

 

Core Values Delivered to Customer

  • The entire project was completed 40% under budget and strictly on schedule
  • Achieved a 30% reduction in manufacturing cost, significantly enhancing the customer’s market competitiveness
  • Completed product design and prototyping in North America, followed by a seamless production transfer to Changzhou for mass manufacturing

Hyundai

Copy the code below and paste it onto every page of your website. 1. Paste this code as high in the of the page as possible: